Regulator 31 "Change Order" Yacht for Sale
301 views
Regulator 31 "Change Order"
Yacht for SaleASKING PRICE : 640,000
301 views
Overview
- Legendary Regulator Ride with Full Option package- partial option list below
- Storm Gray Hull Color
- Storm Gray Bracket, Flexi Teak on Motor Bracket
- Storm Gray underside of T-top
- Storm Gray Underside of Buggy Top
- Twin 450hp Yamaha engines, 70 hrs, Transferrable Warranty until 3/1/2032
- Cockpit freshwater engine flushing option
- Yamaha Helm Master Plus at both stations
- Yamaha Integrated Autopilot with Auto-Routing
- SeaKeeper Ride Automatic Trim Tab System
- SeaKeeper 2 Gyro Ready (cradle is mounted beneath the Helm Seat)
- 3x Deluxe Mezzanine Tackle Center
- Triple Axle AmeraTrail trailer with all Upgrades (in the water twice)
- Custom Tower with full upper control station, Trailerable. Warped ladder design stays tight to the Mezz seat, (4) rod holders per side, plus 3 additional rod holders across the back, (2) stereo speakers, (2) 12 v electric reel plugs, Carbon fiber tilt steering wheel, LED Light bar, Cup Holders, Forward "Cobas Casting" rod holders. Buggy Top with Starlink antenna on top, Custom painted Black, underside Gray.
- Barrier Coated and Bottom Painted with Custom painted Horizontal Boot Stripe
- Thru Stem Anchor Windlass with all chain rode, freshwater anchor wash down
- Dove Gray and White Quilted Upholstery Option
- Upholstery Covers for Front seat, Dash and Helm Seat (Deep Gray Sunbrella)
- Garmin HD Navigation package with (2) 8616 touch screens, (1) 8612 on tower
- Garmin GMR Fantom 54 xHD 4kw Radar antenna
- CHIRP Transducer
- (3) Garmin 215 VHF Radios, one at tower
- LED LightBar (Factory Option)
- 2nd LED Lightbar on custom tower
- Starlink Wifi system with inverter
- 110v Battery Charger (Factory Option)
- Full Factory 3 sided Curtain Package (still in the box)
- Factory Gaff holder option
- Fusion Apollo 770 Stereo with Entertainment upgrade, (2) JL Audio Amps, JL Subwoofer, plus 10 JL Audio backlit LED Speakers, AM/FM/Bluetooth/Apple Airplay2/SXM Capable
- Garmin GMR54 SiriusXM Marine Weather Receiver
- (2) Inductive cell phone chargers
- T-top Rocket Launcher
- Gemlux Bluewater Outrigger Elbows with 22' Carbon Fiber collapsible outrigger poles (Professionally rigged)
- MultiColor Underwater LED Lights
- (8) Additional forward Cupholder/Rod Holder, Gemlux No-Bolt
- (2) Additional aft rod holders, Gemlux No-Bolt
- Gray Regulator helm standing pad, at main helm station
- Gray Seadeck standing pad for Tower
- Custom Gray Tower Upholstery with Regulator Logo Embroidered
- Forward Sunshade with Carbon Fiber poles (Deep Gray) still in the box
- Lazarette Bucket Holder Option
- (2) Hose Coils (one for Freshwater, one for Raw water)
- Forward seat cushions stored inside of the Console
- Fresh water electric flushing toilet inside of the Console
- Freshwater sink inside of the Console
- 12 volt light inside of the Console
- Plus all of the Regulator Standard features
Highlights
-
ManufacturerRegulator
-
Model31
-
Year2025
-
LOA31 ft 3 in - 9.53 meter
-
Beam10 ft 3 in - 3.12 meter
-
Draft - max2 ft 11 in - 0.89 meter
-
Engine BrandYamaha
-
Engine Hours70
Basic Information
-
CategoryPower
-
ConditionUsed
-
LocationHampton, VA, US
-
Vessel NameChange Order
-
Boat TypeCenter Console
-
Hull MaterialFiberglass
-
HIN:DJI31385J425
-
Designer:Lou Codega
-
Flag of RegistryUS
-
Available for sale in U.S. watersYes
Dimensions & Weight
-
Length31 ft - 9.45 meter
-
LOA:31 ft 3 in - 9.53 meter
-
Beam:10 ft 3 in - 3.12 meter
-
Draft - max:2 ft 11 in - 0.89 meter
-
Dry Weight:12500 lbs
Engine
-
Make:Yamaha
-
Model:XF450NSA2
-
Engine(s):2
-
Hours:70
-
Cruise Speed:40 MPH
-
Engine Type:Outboard
-
Fuel Type:Gas/Petrol
-
Horsepower:450 (Individual), 900 (combined)
-
Max Speed:67 MPH
Tank Capacities
-
Fuel Tank:300 gallons - 1 tank(s)
-
Fresh Water Tank:35 gallons - 1 tank(s)
-
Holding Tank:6 gallons - 1 tank(s)
Accommodations
-
Total Heads:1
Descriptions
- 2025 AmeraTrail AS3032TTOB
Trailer Info
2025 AmeraTrail model 3032TTPB
- 21,000 lb GVWR
- Triple Torsion Axle Aluminum I-Beam trailer with forward Target Bunks
- Stainless steel hardware package
- LED Light Package
- Electric over Hydraulic Brakes (disk brakes on all 3 axles)
- Aluminum Wheels for all 7 tires (including spare)
- Spare Tire mount with Spare Hub assembly
- all tires are 235x16 ER Radial tires
- Vee Stop bow catcher
- Heavy Duty Jack Stand
- PVC Guide Poles
Disclaimer
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.
Disclaimers
Location
Schedule a Tour of Regulator 31 "Change Order"
Contact our team to schedule a private showing.
Generating PDF











