Overview
One of the most capable offshore performance cats available today. This 2025 P420 is pre-owned with only 50 engine hours. Powered by twin Mercury Racing 500R outboards producing a combined 1,000 hp, built on a vacuum-bagged carbon fiber hull for maximum strength and minimum weight.
Construction & Structure
- Carbon hull and deck lay-up, vacuum-bagged e-Glass Epoxy/Carbon Fiber
- Stringers and bulkheads formed from Foam Core/Carbon Fiber Reinforced
- Faired hull and deck joint, no rub rail
Cockpit & Interior
- Custom 8-person interior with Alcantara accents, Ultra Leather and Suede
- Sea Dek flooring
- Wrap around windshield
- Illuminated billet cockpit handles
- Tilt steering with Isotta steering wheel
- Cup holders (qty 8), 8" pop-up cleats (qty 6)
- Large lined storage locker rear of cockpit
- Storage compartments with Performance logo
- Cockpit cover included
Electronics & Navigation
- Garmin 8622 22" display centered in dash
- Vessel View 903
- Bocatech switches
- Carbon fiber dash panels
- Mercury DTS throttles and shifters
Electrical & Mechanical
- 3 AGM batteries w/remote dash switch
- 3-bank battery charger
- Bilge pumps w/automatic float switches
- Cockpit blower vents
- LED nav and cockpit lighting
- Shadow Caster underwater lights, cockpit and bilge lights
Hardware
- Billet jack plates
- Stainless tie bar
- Pull-out telescoping ladder
- Mercury CNC 5-blade cleaver props
- Fire extinguisher with billet mount
Audio
- Fusion head unit
- JL multi-channel amp, speakers, sub and box
Pricing Options
- $829,950 -- flat trailer
- $939,950 -- Custom CTS tilt trailer
Transport and financing available.
Highlights
-
ModelP420
-
Year2025
-
LOA42 ft - 12.8 meter
-
Beam11 ft 2 in - 3.4 meter
-
Engine Hours50
Basic Information
-
CategoryPower
-
ConditionUsed
-
LocationDoral, FL, US
-
Vessel NameChange Order
-
Boat TypePower Catamaran
-
Hull MaterialFiberglass
-
HIN:APG42005K425
-
Flag of RegistryUS
-
Available for sale in U.S. watersYes
Dimensions & Weight
-
Length42 ft - 12.8 meter
-
LOA:42 ft - 12.8 meter
-
Beam:11 ft 2 in - 3.4 meter
Engine
-
Model:500R
-
Engine(s):1
-
Hours:50
-
Engine Type:Outboard
-
Fuel Type:Gas/Petrol
-
Horsepower:1000 (Individual), 1000 (combined)
Descriptions
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.
Disclaimers
Location
Schedule a Tour of P420 "Change Order"
Contact our team to schedule a private showing.
Other Yachts For Sale
You may be interested in these yachts as well! The following options are a sample of additional choices and if you would like to see more similar yachts please click below.
Generating PDF











