facebook
Next Generation Yachting
Login
SearchSearch

Viking 64 2007 "Critical Path"

  • 64 ft
  • Sport Fishing
  • Fort Lauderdale, FL, US

Yacht Price

1,599,000

Overview

Preliminary listing, more info to come! Critical Path - 64 Viking 2007 is new to market! Viking is in great condition and has full time captain with open check book policy. There have been many upgrades over the past 5 years. Located in Fort Lauderdale and easy to view.

Highlights

  • Manufacturer
    Viking
  • Model
    64
  • Year
    2007
  • LOA
    64 ft - 19.51 meter
  • Beam
    19 ft 2 in - 5.84 meter
  • Draft - max
    5 ft 2 in - 1.58 meter
  • Engine Brand
    Caterpillar
  • Engine Hours
    3427
  • Number of Rooms
    4
  • Category
    Power
  • Condition
    New
  • Location
    Fort Lauderdale, FL, US
  • Vessel Name
    Critical Path
  • Boat Type
    Sport Fishing
  • Hull Material
    Fiberglass
  • HIN:
    USAGL565B20202
  • Flag of Registry
    US
  • Available for sale in U.S. waters
    Yes
  • Length
    64 ft - 19.51 meter
  • LOA:
    64 ft - 19.51 meter
  • Beam:
    19 ft 2 in - 5.84 meter
  • Draft - max:
    5 ft 2 in - 1.58 meter
  • Make:
    Caterpillar
  • Model:
    C32A SMOH
  • Engine(s):
    2
  • Hours:
    3427
  • Cruise Speed:
    32 MPH
  • Joystick Control:
    No
  • Fuel Type:
    Diesel
  • Max Speed:
    46 MPH
  • Fuel Tank:
    1930 gallons - 1 tank(s)
  • Fresh Water Tank:
    3200 gallons - 1 tank(s)
  • Holding Tank:
    200 gallons - 1 tank(s)
  • Total Cabins:
    4
  • Total Heads:
    3
  • Captains Cabin:
    No
Additional Information

Critical Path - 64 Viking 2007 is new to market! Viking is in great condition and has full time captain with open check book policy. There have been many upgrades over the past 5 years. Located in Fort Lauderdale and easy to view.

Recent Updates

(2024) New eskimo ice chipper, cockpit freezer, bridge freezer, & bridge fridge

(2024) Starlink

(2024) Insulated all fridge/freezer boxes.

(2023) SeaKeeper sphere replaced under warranty.

(2023) Custom livewell lid

(2023) Aftercooler replacement

(2023) Electronics & exterior audio replacement

(2022)New interior runner

(2022) New turbo chargers

(2022) New windlass

(2021) Exhaust risers rebuilt.

(2021)Major generator service

(2021) Mezzanine cushions replaced.

(2020) Bow thruster rebuilt.

(2019) new countertops, carpet, some TVs, and bedding



Vessel Walkthrough

Boarding the cockpit of the 64' Viking 2007 "Critical Path" you immediately notice the big cockpit, with the 19'2" beam it provides a 180 square foot cockpit complete with mezzanine seating. Cockpit highlights include:

  • Mezzanine seating. Cushions replaced (2021)
  • Teak Cockpit (2018) & Mezzanine Flooring
  • Teak Fighting Chair
  • Teak Rocket Launcher
  • SunShade
  • In-Deck Fish Box with Split Lid
  • In-Deck Fish Box/ Ice Maker
  • Refrigerated Step Box
  • New cockpit freezer
  • Under Mezzanine Seating Bait Freezers
  • Fresh/Saltwater washdown
  • Storage Under Port/Starboard Coamings
  • (2) 24 Volt Receptacles in Under Coaming Storage
  • JL Audio Speakers and fusion control (2023)

You enter the salon through the electronically powered door. Critical Path has a traditional convertible layout, which features the salon, galley and dinette all on one level. This space is very social and inviting as an interior gathering space for family and friends after a day out on the water. The high gloss teak finish is in good condition.

To port is a large L shaped sofa with storage beneath. To starboard is storage cabinets and pop up TV with Garmin capabilities. Just forward on starboard side is the dinette with a high gloss teak table. The dinette also has a flat screen TV with Garmin capabilities. Across to port is the fully equipped galley. The galley countertops have two bar stools on the salon side. The galley features everything you need while away from the dock:

  • (6) under counter Sub Zero drawers 4 fridge, 2 freezer
  • New Countertops (2019)
  • New carpet (2019)
  • New Carpet Runner (2022)
  • Ice Maker
  • Electric cook top
  • Microwave convection oven
  • Deep SS sink with disposal
  • Exceptional storage

The centerline stairwell separating the galley and dinette leads down to the lower accommodations. The layout below features a four stateroom three head arrangement.

At the base of the stairs to the aft and starboard is the entrance to the first guest staterooms. This room features Criss-cross bunks

Just forward and to the port is the master stateroom with a private ensuite head. Back out to the companionway and across the hall is bunk bed room to starboard and laundry facilities to port. All the way forward is the VIP stateroom with ensuite head.

Guest Stateroom 1

  • Criss cross bunks
  • Nightstand in between
  • TV
  • Reading lights
  • Climate controls
  • Cedar lined hanging locker

Guest stateroom 2

  • Bunk beds
  • Hanging locker
  • Climate controls

VIP stateroom

  • Island queen berth
  • TV
  • Storage beneath bed
  • Twin hanging lockers
  • Hatch for overhead light
  • Climate controls
  • Ensuite Head

Master Stateroom

  • Island king berth
  • large hanging closet
  • Ensuite head
  • TV
  • Climate controls

Back out to the cockpit and up the ladder on the starboard side forward leads us to the flybridge. The bridge is large with ample seating. There is an L-shaped lounge forward of the helm station and a bench seat that runs fore and aft on the starboard side. "Critical Path" has a teak helm pod with single lever Palm Beach controls with bow thruster buttons built in. For safety purposes there is a fiberglass hatch cover that drops to cover the open ladder well. Forward of the helm features a HUGE deep freezer and a refrigerated drink box (2024). The electronics were replaced in 2023.

  • Release Marine Teak Helm Chairs
  • Release Marine Teak Helm Pod
  • Single Lever Controls With Bow Thruster Controls
  • Electronic Trolling Valves
  • (4) Garmin GPSMAP Touch Screens (2023)
  • Fusion Apollo Head unit (2023)
  • (2) ICOM VHF Radios
  • Seakeeper Control Panel
  • Side Power Bow Thruster
  • Simrad AP26 Autopilot
  • ACR Spotlight
  • MiyaEnoch US-9 teaser reels
  • New Bridge/Console Bait Freezer (2023)
  • New bridge refrigerator (2023)

Tower

  • Garmin GPSMAP Touch Screen
  • Garmin Tri Data
  • Controls
  • VHF
Engine/Mechanical Equipment
  • Twin CAT C32A w/ 3430 hours SMOH
  • Twin Onan generators w/ 4355/4473 hours
  • Water Maker
  • LED Lights
  • Exhaust risers rebuilt (2021)
  • Major Generator Service (2021)
  • New Turbo Cartridges (2022)
  • Aftercooler replacement (2023)



Disclaimer
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.

Next Generation Yachting operates as a Buyer Agent and is not the Listing Agent for the above yacht displayed on our Multiple Listings Search (MLS) system. Our aim is to provide a comprehensive and easy to use yacht listings database as a service to assist potential buyers in their purchasing process, without conveying representation of such listing. Our team's Buyer Agents services are readily available to you, should you require assistance with your purchase. Our expertise includes previewing yachts, preparing offers, organizing surveys and sea trials, and providing assistance with the closing process and beyond. If you would like to learn more about our Buyer Agent Services, please click here.
  • Critical Path - 64 Viking 2007

Location

Need more information? Please contact our Viking Yachts expert


Gallery

Our Services

Buying a Yacht

BUYER

REPRESENTATION

Learn more
Sell your Yacht

SELLER

REPRESENTATION

Learn more
Financing

YACHT

FINANCING

PRE-APPROVAL

 

Similar Yachts For Sale

Generating PDF

Close

Contact Us

Contact Details

Next Generation Yachting

1815 Purdy Ave
Miami Beach, FL 33139

+1 786.246.9873

[email protected]

Online Inquiry

Search Yachts by Brand


  1. Absolute Yachts
  2. Absolute Yachts for sale in Florida
  3. Astondoa Yacht for sale in Florida
  4. Astondoa Yachts
  5. Atlantis Yachts
  6. Axopar Boats
  7. Azimut Yachts
  8. Azimut Yachts for sale in Florida
  9. Benetti Yachts
  10. Benetti Yachts for sale in Florida
  11. Bertram Yachts
  12. Boston Whaler
  13. Cabo Yachts
  14. Canados Yachts
  15. Cigarette Boats
  16. Cigarette Boats for sale in Florida
  17. Cigarette Boats for sale in Florida
  18. Cruisers Yachts for sale
  19. Fairline Yachts
  20. Ferretti Yachts
  21. Ferretti Yachts for sale in Florida
  22. Fjord Boats
  23. Flemings Yachts
  24. Galeon Yachts
  25. Galeon Yachts for sale in Florida
  26. Guy Couach Yachts
  27. Hampton Yachts
  28. Hampton Yachts for sale in Florida
  29. Hatteras Yachts
  30. HCB Boats
  31. Hinckley Boats
  32. Hinckley Boats for sale in Florida
  33. Horizon Yachts
  34. Intrepid Boats
  35. ISA Yachts
  36. Jetcar
  37. Lagoon Catamarans for sale in Florida
  38. Lazzara Yachts
  39. Lazzara Yachts for sale in Florida
  40. Leopard Yachts
  41. Mangusta Yachts
  42. Maritimo Yachts
  43. Marlow Yachts
  44. Midnight Express Boats
  45. Monte Carlo Yachts
  46. MTI Boats
  47. MTI Boats for sale in Florida
  48. Nor-Tech Boats
  49. Numarine Yachts
  50. Ocean Alexander Yachts
  51. Ocean Alexander Yachts for sale in Florida
  52. Pardo Yachts
  53. Pershing Yachts
  54. Pershing yachts for sale in Florida
  55. Prestige Yachts
  56. Prestige Yachts for sale in Florida
  57. Princess Yachts
  58. Princess Yachts for sale in Florida
  59. Riva Yachts
  60. Riva Yachts for sale in Florida
  61. Riviera Yachts
  62. Sanlorenzo Yachts
  63. Sanlorenzo Yachts for sale in Florida
  64. Sea Ray Yachts
  65. Sea Vee Boats
  66. Sunreef Catamarans for sale in Florida
  67. Sunseeker Yachts
  68. Sunseeker Yachts for sale in Florida
  69. Tiara Yachts
  70. Viking Yachts
  71. Viking Yachts fort sale in Florida
  72. Westport Yachts
  73. Westport Yachts for sale in Florida
  74. Yellowfin Boats
Close Success

Thank You


If you would like to improve your browsing experience and save your preferences, sign up or log in to your account.

Top