Viking 64 2007 "Critical Path"
Yacht Price
Overview
Preliminary listing, more info to come! Critical Path - 64 Viking 2007 is new to market! Viking is in great condition and has full time captain with open check book policy. There have been many upgrades over the past 5 years. Located in Fort Lauderdale and easy to view.
Highlights
-
ManufacturerViking
-
Model64
-
Year2007
-
LOA64 ft - 19.51 meter
-
Beam19 ft 2 in - 5.84 meter
-
Draft - max5 ft 2 in - 1.58 meter
-
Engine BrandCaterpillar
-
Engine Hours3427
-
Number of Rooms4
-
CategoryPower
-
ConditionNew
-
LocationFort Lauderdale, FL, US
-
Vessel NameCritical Path
-
Boat TypeSport Fishing
-
Hull MaterialFiberglass
-
HIN:USAGL565B20202
-
Flag of RegistryUS
-
Available for sale in U.S. watersYes
-
Length64 ft - 19.51 meter
-
LOA:64 ft - 19.51 meter
-
Beam:19 ft 2 in - 5.84 meter
-
Draft - max:5 ft 2 in - 1.58 meter
-
Make:Caterpillar
-
Model:C32A SMOH
-
Engine(s):2
-
Hours:3427
-
Cruise Speed:32 MPH
-
Joystick Control:No
-
Fuel Type:Diesel
-
Max Speed:46 MPH
-
Fuel Tank:1930 gallons - 1 tank(s)
-
Fresh Water Tank:3200 gallons - 1 tank(s)
-
Holding Tank:200 gallons - 1 tank(s)
-
Total Cabins:4
-
Total Heads:3
-
Captains Cabin:No
Critical Path - 64 Viking 2007 is new to market! Viking is in great condition and has full time captain with open check book policy. There have been many upgrades over the past 5 years. Located in Fort Lauderdale and easy to view.
Recent Updates
(2024) New eskimo ice chipper, cockpit freezer, bridge freezer, & bridge fridge
(2024) Starlink
(2024) Insulated all fridge/freezer boxes.
(2023) SeaKeeper sphere replaced under warranty.
(2023) Custom livewell lid
(2023) Aftercooler replacement
(2023) Electronics & exterior audio replacement
(2022)New interior runner
(2022) New turbo chargers
(2022) New windlass
(2021) Exhaust risers rebuilt.
(2021)Major generator service
(2021) Mezzanine cushions replaced.
(2020) Bow thruster rebuilt.
(2019) new countertops, carpet, some TVs, and bedding
Vessel Walkthrough
Boarding the cockpit of the 64' Viking 2007 "Critical Path" you immediately notice the big cockpit, with the 19'2" beam it provides a 180 square foot cockpit complete with mezzanine seating. Cockpit highlights include:
- Mezzanine seating. Cushions replaced (2021)
- Teak Cockpit (2018) & Mezzanine Flooring
- Teak Fighting Chair
- Teak Rocket Launcher
- SunShade
- In-Deck Fish Box with Split Lid
- In-Deck Fish Box/ Ice Maker
- Refrigerated Step Box
- New cockpit freezer
- Under Mezzanine Seating Bait Freezers
- Fresh/Saltwater washdown
- Storage Under Port/Starboard Coamings
- (2) 24 Volt Receptacles in Under Coaming Storage
- JL Audio Speakers and fusion control (2023)
You enter the salon through the electronically powered door. Critical Path has a traditional convertible layout, which features the salon, galley and dinette all on one level. This space is very social and inviting as an interior gathering space for family and friends after a day out on the water. The high gloss teak finish is in good condition.
To port is a large L shaped sofa with storage beneath. To starboard is storage cabinets and pop up TV with Garmin capabilities. Just forward on starboard side is the dinette with a high gloss teak table. The dinette also has a flat screen TV with Garmin capabilities. Across to port is the fully equipped galley. The galley countertops have two bar stools on the salon side. The galley features everything you need while away from the dock:
- (6) under counter Sub Zero drawers 4 fridge, 2 freezer
- New Countertops (2019)
- New carpet (2019)
- New Carpet Runner (2022)
- Ice Maker
- Electric cook top
- Microwave convection oven
- Deep SS sink with disposal
- Exceptional storage
The centerline stairwell separating the galley and dinette leads down to the lower accommodations. The layout below features a four stateroom three head arrangement.
At the base of the stairs to the aft and starboard is the entrance to the first guest staterooms. This room features Criss-cross bunks
Just forward and to the port is the master stateroom with a private ensuite head. Back out to the companionway and across the hall is bunk bed room to starboard and laundry facilities to port. All the way forward is the VIP stateroom with ensuite head.
Guest Stateroom 1
- Criss cross bunks
- Nightstand in between
- TV
- Reading lights
- Climate controls
- Cedar lined hanging locker
Guest stateroom 2
- Bunk beds
- Hanging locker
- Climate controls
VIP stateroom
- Island queen berth
- TV
- Storage beneath bed
- Twin hanging lockers
- Hatch for overhead light
- Climate controls
- Ensuite Head
Master Stateroom
- Island king berth
- large hanging closet
- Ensuite head
- TV
- Climate controls
Back out to the cockpit and up the ladder on the starboard side forward leads us to the flybridge. The bridge is large with ample seating. There is an L-shaped lounge forward of the helm station and a bench seat that runs fore and aft on the starboard side. "Critical Path" has a teak helm pod with single lever Palm Beach controls with bow thruster buttons built in. For safety purposes there is a fiberglass hatch cover that drops to cover the open ladder well. Forward of the helm features a HUGE deep freezer and a refrigerated drink box (2024). The electronics were replaced in 2023.
- Release Marine Teak Helm Chairs
- Release Marine Teak Helm Pod
- Single Lever Controls With Bow Thruster Controls
- Electronic Trolling Valves
- (4) Garmin GPSMAP Touch Screens (2023)
- Fusion Apollo Head unit (2023)
- (2) ICOM VHF Radios
- Seakeeper Control Panel
- Side Power Bow Thruster
- Simrad AP26 Autopilot
- ACR Spotlight
- MiyaEnoch US-9 teaser reels
- New Bridge/Console Bait Freezer (2023)
- New bridge refrigerator (2023)
Tower
- Garmin GPSMAP Touch Screen
- Garmin Tri Data
- Controls
- VHF
- Twin CAT C32A w/ 3430 hours SMOH
- Twin Onan generators w/ 4355/4473 hours
- Water Maker
- LED Lights
- Exhaust risers rebuilt (2021)
- Major Generator Service (2021)
- New Turbo Cartridges (2022)
- Aftercooler replacement (2023)
Disclaimer
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.
Critical Path - 64 Viking 2007
Location
Need more information? Please contact our Viking Yachts expert
Gallery
Our Services
BUYER
REPRESENTATION
SELLER
REPRESENTATION
YACHT
FINANCING
Similar Yachts For Sale
-
Based on price range and size you may be interested in these yachts as well! The following options are a sample of additional choices and if you would like to see more similar yachts please click below.
-
Generating PDF