|
Basic Information
Dimensions & Weight
Engine
TANK CAPACITIES
ACCOMMODATIONS
Overview-
DescriptionsACCOMMODATION
AZIZAM sleeps 8 guests in 4 luxurious cabins plus 2 crew in 1 external crew cabin. The master cabin, located in the port, aft hull, a beautifully finished master cabin with walk-around double bed (200x160). Flooded with natural light from seven different hatches and hull windows. Writing desk, drawers, ¾ length wardrobes with tonnes of storage. Ensuite with large, separate shower. Flat screen TV and Radio. Two guest cabins: the VIP double (200x160cm) cabin located in starboard aft hull with ensuite and large shower. Guest port forward. Split, twin beds 205cm x 160-130cm with ensuite and shower cubicle. The crew cabin is starboard forward. Split twin beds 205cm x 160-130cm with ensuite and shower cubicle MAIN MACHINERY2 x Yanmar 150Hp engines 1 x Cummins Onan generator 1 x Dessalator watermaker (140 L/h) NAVIGATION INSTRUMENTS2x new B&G Zeus plottors 2x B&G Multi-screens 4x B&G 20-20s 2x Simrad Autopilot controls OTHER EQUIPMENTElectrolux Intuition 7kg washing machine located in the Starboard Laz Industrial glass washer (dishwasher) located in galley ENTERTAINMENTSaloon TV Master cabin TV Apple TV and BlueRay Player Bose surround system in Saloon Bose speakers 4G WiFi Router SPARS & RIGGINGCarbon mast Park Ave boom Harken winches TENDER & TOYSAB 4.3m tender with Mercury 40Hp outboard Kawasaki 150Hp 3 seat Jetski 2x Seabobs UPGRADES AND WORKLIST2022/2023 - Jobs completed 1: Paint job on both hulls deck and cockpit roof. (Not belly)but everything else (All hardware removed polished and refitted.) 2: New port window 3: 3 other forward windows removed, cleaned up and refitted 4: New trampolines 5: new forward hatches (crew and crew Heads) 6: New kitchen hob area 7: New extractor fan 8: S/B chainplate totally replaced and reinforced back to bulkhead 9: Port chain plate reinforced as per s/b back to bulkhead 10: Area around chain plate rebuilt 11: Genoa chainplate rebuilt 12: New port guard rails and nav light 13: New ladder for bathing platform 14: New ladder for deck to coach roof 15: New Life rafts ( Ocean safety Regatta ISO 9650 ) 3 Off 16: New over 24 hour Life raft packs 3 Off 17: New Jon Buoys. 2 off 18: New Ocean safety Life jackets (with hood, light and whistle)13 off 19: New fire extinguishers thoughtout 20: New Panasonic Microwave/Grill/Oven Underway at present (Aug/Sept 2023) A: S/B rudder lower section removed and rebuilt (underway) B: new mast and boom by Lorima C: New standard rigging by Navtec D: new running rigging throughout E: new structural furlers (Genoa 54T and Jib30T) Facnor. F: new Radar G: new nav, Deck, Horn, Motoring, Mast head, External fire ligts H: new Lighting protection system on mast I: New Harkin switch system J: New Harkin Cars,Batten system and head plate. K: New Mast steps , Dog Bones and all other modern Fittings on Mast L: New main sail by UK Sail Makers (square Head)230 m2 M: New Genoa 135 m2 N: New Jib 91m2 O: New Sail bag sunbrelle. Gallery |